Meeting requirements at a good price.
Athabasca Fire Services Chief, Bryan Hall, was looking for a training structure that met the needs of the Athabasca County Fire Department. His requirements were met at a good price, with options for a phase two expansion.
This structure includes:
- Three 40 ft. containers
- Four doors
- Four windows
- Openings between units.
- 10 ft. Class A burn room
- Concrete floors
- Interior stairs for below grade attack
- 12 ft. interior maze with steel movable walls
“Fire Training Solutions was absolutely fantastic to work with. From design to build, working with Richard and Mike has been a pleasure. Incorporating design and functionality while keeping [the project] on price was a must – and Fire Training Solutions definitely delivered. Thanks for the great facility! Would definitely recommend using Fire Training Solutions in the future.”
– Bryan Hall, Athabasca County Fire Services
Looking for more inspiration?
Browse through our collection of completed structures while you dream up your own. And when you’re ready, contact us to create a structure that’s all you imagined.