A successful build that alleviated inefficiencies and came in under budget.
This structure includes:
“The Training Staff worked directly with with the design engineer and Fire Training Solutions on a draft design. This design was converted into a virtual model which was an awesome opportunity to ‘walk’ through the layout and make sure everything would flow as intended. The final draft was approved and fabrication started. During the construction phase on site, having someone present in the design phase was key and allowed the build to go seamlessly.”
– Even Stewart, Deputy Fire Chief
Looking for more inspiration?
Browse through our collection of completed structures while you dream up your own. And when you’re ready, contact us to create a structure that’s all you imagined.